Rolling stock?: Yes
Announcement details: CITROEN BERLINGO 4x4 Dangel from 21/11/2016 - 160,773 km
New remanufactured engine at 76,190 km. It is therefore 84,583 km long.
Downloadable Technical Inspection (MOT)
History:
11/04/25: catalytic converter replacement
2/12/24 Battery Replacement
13/09/24 : Change of left steering ball joint + rear shock absorber stop
23/05/24 : Change of the 2 transmissions + spy gaskets
3/05/24 : Change DPF + UREA injector
5/02/24 : Replacement of discs + front pads
23/11/23 : EOLYS tank exchange + apprenticeship
21/07/23 : Change of central engine mount
11/01/23 : Replacement B.V, thermostat box + clutch kit with stop
25/09/20: Standard engine exchange with full clutch (invoice)
Payment terms: Payment by certified bank check, physical payment by credit card (no limit limit), payment by bank transfer (no limit limit).
Withdrawal procedures: The highest bidder must pay the amount of the bid to the Public Treasury. The object must be collected, by him, on site, no more than 15 days after the auction end date. To do this, the bidder must bring the payment receipt issued by the Treasury and the winning bid confirmation email. As specified in our general terms and conditions of sale, the property will be removed as is, there is no guarantee on the property sold. The buyer will have to ensure himself the adequate means of loading and transporting the goods. No assistance will be provided for the collection of the property sold.
Rolling stock?: Yes
Announcement details: CITROEN BERLINGO 4x4 Dangel from 21/11/2016 - 160,773 km
New remanufactured engine at 76,190 km. It is therefore 84,583 km long.
Downloadable Technical Inspection (MOT)
History:
11/04/25: catalytic converter replacement
2/12/24 Battery Replacement
13/09/24 : Change of left steering ball joint + rear shock absorber stop
23/05/24 : Change of the 2 transmissions + spy gaskets
3/05/24 : Change DPF + UREA injector
5/02/24 : Replacement of discs + front pads
23/11/23 : EOLYS tank exchange + apprenticeship
21/07/23 : Change of central engine mount
11/01/23 : Replacement B.V, thermostat box + clutch kit with stop
25/09/20: Standard engine exchange with full clutch (invoice)
Payment terms: Payment by certified bank check, physical payment by credit card (no limit limit), payment by bank transfer (no limit limit).
Withdrawal procedures: The highest bidder must pay the amount of the bid to the Public Treasury. The object must be collected, by him, on site, no more than 15 days after the auction end date. To do this, the bidder must bring the payment receipt issued by the Treasury and the winning bid confirmation email. As specified in our general terms and conditions of sale, the property will be removed as is, there is no guarantee on the property sold. The buyer will have to ensure himself the adequate means of loading and transporting the goods. No assistance will be provided for the collection of the property sold.
أظهر المزيد
عرض أقل